Q-2, r. 19 - Regulation respecting the landfilling and incineration of residual materials

Full text
149.4. A monetary administrative penalty of $750 in the case of a natural person or $3,500 in other cases may be imposed on any person who fails
(1)  to comply with the conditions provided for in the first paragraph of section 9 relating to the landfilling of fly ash or residue that contains fly ash;
(2)  to site an engineered landfill on land that complies with the conditions, in particular the siting conditions, prescribed by section 20, the first paragraph of section 21 or section 22;
(3)  to ensure that the excavation carried out in a zone referred to in the second paragraph of section 21 complies with the conditions provided for therein;
(4)  to comply with the conditions provided for in section 23 relating to the liner system referred to therein or at groundwater level;
(5)  to comply with the conditions provided for in section 24 regarding the siting of an engineered landfill in a quarry or a mine;
(5.1)  to comply with the conditions provided for in section 24.1 relating to the siting of a stockpiling platform for contaminated soil or other residual materials intended to be used as cover material;
(6)  to provide an engineered landfill with a collection system complying with the first or third paragraph of section 25 or any other system in the case and on the conditions provided for in the second paragraph of that section;
(7)  to provide an engineered landfill referred to in section 26 with a second collection system complying with that section;
(8)  to comply with the conditions on design or the installation of leachate collection systems provided for in section 27;
(9)  to ensure that every component of a system referred to in the first paragraph of section 28 is leakproof and that the system is adequately protected in accordance with that section;
(10)  to provide an engineered landfill referred to in the first or second paragraph of section 32 with a biogas collection system complying with that section;
(11)  to remove biogas collected in the landfills referred to in the second paragraph of section 32 using the equipment complying with the third or fourth paragraph of that section;
(12)  to comply with the conditions provided for in the first or second paragraph of section 34 relating to the materials or the installation of the systems referred to in that section;
(13)  to have verified the materials and equipment referred to in section 35 in accordance with that section;
(14)  to have the work referred to in the first paragraph of section 36 supervised by independent experts in accordance with that section;
(15)  to comply with the conditions provided for in the fourth or fifth paragraph of section 41 relating to the cover or landfilling of the residual materials referred to therein;
(16)  to comply with the conditions provided for in the sixth paragraph of section 42 relating to the stockpiling in an engineered landfill of the contaminated soils or other residual materials referred to therein;
(17)  to maintain at all times in proper working order the systems referred to in section 44 or to control, maintain or clean those systems in accordance with that section;
(18)  to ensure that the systems referred to in section 44 work as to guarantee compliance with the requirements of section 27;
(19)  to comply with the terms provided for in the first, second or third paragraph of section 61 regarding the operation of the systems and equipment referred to therein;
(20)  to ensure that the concentration of nitrogen or oxygen prescribed by the first paragraph of section 62 are met in the cases and on the conditions referred to therein;
(21)  to comply with the conditions provided for in the third paragraph of section 62 relating to the halting of the biogas pumping system referred to therein;
(22)  to take or have taken or have analyzed the samples prescribed by section 63 according to the frequency and conditions provided for in the first, second, third, fourth and fifth paragraphs of that section;
(23)  to measure the flow of the leachate or the flow of the discharges referred to in the sixth paragraph of section 63, on the conditions referred to therein;
(24)  to leak test or have leak tested the pipes or components referred to in the first or second paragraph of section 64 according to the frequency and conditions provided for therein;
(25)  to install the required number of wells or networks of observation wells prescribed by section 65 in the cases and on the conditions provided for therein;
(26)  to take or have taken or have analyzed the samples prescribed by the first paragraph of section 66 according to the frequency and conditions provided for in the first, third, or, in the case provided for therein, the fifth paragraph of that section;
(27)  to measure or have measured the concentration of methane at the frequency and on the conditions provided for in section 67;
(28)  to measure or have measured the concentration of methane at the frequencies and on the conditions provided for in subparagraph 2 or 3 of the first paragraph of section 68 in the cases referred to therein;
(29)  to continuously measure the destruction temperature or the flow rate of the biogas referred to in the first or second paragraph of section 68 or to verify the destruction efficiency for the organic compounds other than methane in the cases and on the conditions provided for in the second paragraph of that section;
(30)  to permanently close a landfill in the cases and according to the conditions provided for in section 80;
(31)  to cover as soon as deposited the residual materials referred to in paragraph 2 of section 90 or the second paragraph of section 99 or 117 with other materials or soils in the cases provided for in those sections;
(32)  to cover as soon as deposited bituminous coated materials referred to in subparagraph 2 of the second paragraph of section 105 with other materials;
(33)  to provide a construction or demolition waste landfill with a system referred to in section 107 and to put in operation such system on the date provided for in the second paragraph of that section;
(34)  to comply with the conditions provided for in section 108 relating to the final profile of a filled construction or demolition waste landfill;
(35)  to comply with the conditions provided for in section 119 relating to the final cover of a remote landfill;
(36)  to comply with the conditions provided for in the first paragraph of section 125 relating to the layout of an incineration facility referred to in that section;
(37)  (paragraph revoked).
O.C. 666-2013, s. 3; O.C. 868-2020, s. 52.
149.4. A monetary administrative penalty of $750 in the case of a natural person or $3,500 in other cases may be imposed on any person who fails
(1)  to comply with the conditions provided for in the first paragraph of section 9 relating to the landfilling of fly ash or residue that contains fly ash;
(2)  to site an engineered landfill on land that complies with the conditions, in particular the siting conditions, prescribed by section 20, the first paragraph of section 21 or section 22;
(3)  to ensure that the excavation carried out in a zone referred to in the second paragraph of section 21 complies with the conditions provided for therein;
(4)  to comply with the conditions provided for in section 23 relating to the liner system referred to therein or at groundwater level;
(5)  to comply with the conditions provided for in section 24 regarding the siting of an engineered landfill in a rock quarry or a mine;
(6)  to provide an engineered landfill with a collection system complying with the first or third paragraph of section 25 or any other system in the case and on the conditions provided for in the second paragraph of that section;
(7)  to provide an engineered landfill referred to in section 26 with a second collection system complying with that section;
(8)  to comply with the conditions on design or the installation of leachate collection systems provided for in section 27;
(9)  to ensure that every component of a system referred to in the first paragraph of section 28 is leakproof in accordance with that section;
(10)  to provide an engineered landfill referred to in the first or second paragraph of section 32 with a biogas collection system complying with that section;
(11)  to remove biogas collected in the landfills referred to in the second paragraph of section 32 using the equipment complying with the third or fourth paragraph of that section;
(12)  to comply with the conditions provided for in the first or second paragraph of section 34 relating to the materials or the installation of the systems referred to in that section;
(13)  to have verified the materials and equipment referred to in section 35 in accordance with that section;
(14)  to have the work referred to in the first paragraph of section 36 supervised by independent experts in accordance with that section;
(15)  to comply with the conditions provided for in the fourth or fifth paragraph of section 41 relating to the cover or landfilling of the residual materials referred to therein;
(16)  to comply with the conditions provided for in the sixth paragraph of section 42 relating to the stockpiling in an engineered landfill of the contaminated soils or residual materials referred to therein;
(17)  to maintain at all times in proper working order the systems referred to in section 44 or to control, maintain or clean those systems in accordance with that section;
(18)  to ensure that the systems referred to in section 44 work as to guarantee compliance with the requirements of section 27;
(19)  to comply with the terms provided for in the first, second or third paragraph of section 61 regarding the operation of the systems and equipment referred to therein;
(20)  to ensure that the concentration of nitrogen or oxygen prescribed by the first paragraph of section 62 are met in the cases and on the conditions referred to therein;
(21)  to comply with the conditions provided for in the third paragraph of section 62 relating to the halting of the biogas pumping system referred to therein;
(22)  to take or have taken or have analyzed the samples prescribed by section 63 according to the frequency and conditions provided for in the first, second, third, fourth and fifth paragraphs of that section;
(23)  to measure the flow of the leachate or the flow of the discharges referred to in the sixth paragraph of section 63, on the conditions referred to therein;
(24)  to leak test or have leak tested the pipes or components referred to in the first or second paragraph of section 64 according to the frequency and conditions provided for therein;
(25)  to install the required number of wells or networks of observation wells prescribed by section 65 in the cases and on the conditions provided for therein;
(26)  to take or have taken or have analyzed the samples prescribed by the first paragraph of section 66 according to the frequency and conditions provided for in the first, third, or, in the case provided for therein, the fifth paragraph of that section;
(27)  to measure or have measured the concentration of methane at the frequency and on the conditions provided for in section 67;
(28)  to measure or have measured the concentration of methane at the frequencies and on the conditions provided for in subparagraph 2 or 3 of the first paragraph of section 68 in the cases referred to therein;
(29)  to continuously measure the destruction temperature or the flow rate of the biogas referred to in the first or second paragraph of section 68 or to verify the destruction efficiency for the organic compounds other than methane in the cases and on the conditions provided for in the second paragraph of that section;
(30)  to permanently close a landfill in the cases provided for in section 80;
(31)  to cover as soon as deposited the residual materials referred to in paragraph 2 of section 90 or the second paragraph of section 99 or 117 with other materials or soils in the cases provided for in those sections;
(32)  to cover as soon as deposited bituminous coated materials referred to in subparagraph 2 of the second paragraph of section 105 with other materials;
(33)  to provide a construction or demolition waste landfill with a system referred to in section 107 and to put in operation such system on the date provided for in the second paragraph of that section;
(34)  to comply with the conditions provided for in section 108 relating to the final profile of a filled construction or demolition waste landfill;
(35)  to comply with the conditions provided for in section 119 relating to the final cover of a remote landfill;
(36)  to comply with the conditions provided for in the first paragraph of section 125 relating to the layout of an incineration facility referred to in that section;
(37)  to perform or have performed the testing provided for in section 132 in the cases and on the conditions and according to the methods provided for in that section or the first paragraph of section 134.
O.C. 666-2013, s. 3.